• Client Name
    Outback UK Propco I B Ltd
  • Location
    West Drayton
  • Contract Period
    8 weeks
  • Key Services

Symbiotic Solutions were employed to remove soil heaps to previous grade level totalling 12,200 m3.

Prior to main contract works commencing the installation of a temporary bridge and roadway were required to facilitate the waste removal to certified locations.

Key services provided

  • Muck away

Contact us to talk about your project